
Since September, the tram connects LuxExpo with Lycée Bouneweg. With five new stations and two interchange hubs, the next section of the track, to Cloche d’Or, is scheduled to open late 2023 or early 2024.
The extension to Findel takes place in parallel. A bridge spanning the A1 is currently in construction. In 2024, the tram will drive between Findel Airport through the City and finally to Cloche d’Or.
Read also: No tram line through the municipal park, vows François Bausch